construction update 8/30

a quick update:

yesterday we passed inspections for rough plumbing and electrical. the concrete slab is now being prepped.

today we dug outside for the main sewer line for a connection from our trench drain and other drains in the new brewing area. well ... while digging for the sewer line three things were broken: 1) a water line, 2) a gas line, and 3) my sanity. i'll leave it to you to imagine the fun that it caused for us and the other tenants.

what a day...